NISSIYA certified LED bathroom mirror showing ETL and SAA compliance certifications for hospitality and hotel commercial projects.

Quality & Compliance

0

Hotels Served

0

Rooms Installed

0

Countries

0

Average Rating

Third-Party Verified

Our Others Certifications

CE

European Conformity

CE Marking

Confirms all NISSIYA products meet EU safety, health, and environmental protection requirements.

  • -Low Voltage Directive (LVD)
  • -EMC Directive
  • -EcoDesign Directive
RoHS

EU Directive 2011/65

RoHS Compliance

Restricts the use of hazardous substances in electrical and electronic equipment. All NISSIYA LED components and PCBs are RoHS-compliant.

  • -Lead-Free Solder
  • -No Mercury or Cadmium
  • -Full Material Declaration
IP44

Ingress Protection

IP44 Rating

Rated for use in Bathroom Zone 2 and 3. Protection against solid objects over 1mm and water splashing from any direction.

  • -Bathroom Zone 2 Compliant
  • -Dust and Splash Proof
  • -IEC 60529 Tested
Details

NISSIYA Quality Assurance: 24H CASS Test (Grade 10)

Verified by leading third-party laboratories, our hardware consistently passes the 24-hour CASS test (Grade 10), ensuring unparalleled corrosion resistance. As a certified LED mirror manufacturer, we provide this rigorous data to guarantee long-term durability for your commercial projects.

  • 24H CASS: PASSED
  • Requirement: Grade 10
  • Cross-Cut Test: Compliant / Conforms
More Projects
Details

Raw Material Excellence: The Solid Brass Standard

At NISSIYA, quality is not an option; it is our foundation. Every structural component of our LED makeup mirrors is precision-engineered from high-purity solid brass. Unlike standard aluminum or plastic alternatives, our choice of solid brass provides a luxurious, weighted feel and unmatched corrosion resistance, meeting the demanding requirements of five-star hospitality projects worldwide.

  • High-Purity Solid Brass
  • Superior Structural Stability
  • Premium Corrosion Resistance
OUR QUALITY

Factory Process

Quality Control at Every Stage

01

Incoming Inspection

All raw materials and LED components are inspected against specification upon arrival. Rejected batches are returned to supplier with full NCR documentation.

02

In-Process QC

Critical checkpoints at PCB assembly, frame fabrication, and LED strip installation. Dimensional tolerances held to under 0.5mm on all frame profiles.

03

Final Testing

100% of finished units undergo electrical safety testing, lumen output verification, CRI measurement, and visual inspection before packaging.

04

Outgoing Audit

Random AQL 2.5 sampling audit on every outgoing shipment. Full inspection reports shipped with every order above 100 units.